Assembly on site

Prefabrication of all the components of our houses allows the trouble-free, quick and safe assembly of the house at the customer’s construction site. The assembly time for a house with an area of approx. 100 m2 takes on average approx. 4-5 days, until it is secured against weather conditions. For comparison, the traditional way of a wooden house construction could take up to several months. During this time all the materials used would be exposed to weather conditions, what could cause deteriorating or losing their properties.

The assembly of our houses is always carried out in accordance with occupational health and safety, under the supervision of a construction manager with an appropriate permissions.

Address

Brzechwa Sp. z o.o. Sp.k.
ul. Polna 2, 64-600 Oborniki

Telephone

+48 61 64 64 600

Email

biuro@brzechwa.com.pl
Wooden houses are an ideal proposition for people who value economical solutions and an ecological, natural lifestyle. Low operating costs and beautiful architecture are just a few advantages of wooden construction.

Energy-efficient houses
Houses made of half-timbered technology
Block technology house
House in Steico technology
Factory production
Assembly on site

Roof trusses
Gazebos, shelters, garages
Unusual projects
Reconstruction of monuments
General construction

Copyright © 2022 BRZECHWA | Privacy Policy